In the Chuvash village of Akhmatovo, a solemn opening of the road leading to the church and the cemetery took place. This was reported on the website of the local administration, drew the attention of the Telegram channel "CHTD".
“During the event, a symbolic red ribbon was cut in a solemn atmosphere. The construction of the road in the village has become an important event for the villagers, it will become part of the history of the development of the village of Akhmatovo, ”the administration website says.
The opening of the gravel road to the cemetery took place on October 13, its length was 700 meters. LLC "Success" became the construction contractor. The construction took 1.3 million rubles, of which 129,474 were collected by local residents.